false
OasisLMS
Login
Catalog
Risks from Adjacent Construction
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation outlines how to assess and reduce risks to neighboring properties from construction, particularly in dense urban areas. It recommends a phased risk-management process: preconstruction evaluation, analysis of planned construction activities, construction monitoring, and post-construction review.<br /><br />Before work begins, teams should understand the proposed methods—including excavation, support systems, dewatering, pile driving, demolition, and dust and noise controls. A preconstruction survey should document neighboring buildings’ existing condition, identify vulnerable properties, map cracks, inform residents, establish monitoring plans, and set response thresholds. Pilot testing may also help evaluate construction methods.<br /><br />Construction can cause ground movement and vibration through excavation, movement of excavation support systems, deep foundation installation, and dewatering. Potential effects include settlement, tilting, cracking, localized structural distress, and disturbance from vibration. Risk depends on factors such as soil conditions, groundwater, construction methods, and the neighboring structure’s stiffness and condition. These effects should be assessed before construction starts.<br /><br />Monitoring can track cracks, settlement, lateral ground movement, groundwater levels, building tilt, and vibration. Tools include survey prisms and automated theodolites, crackmeters, tiltmeters, shape arrays, piezometers, and seismographs. Continuous data and alerts can help teams act when readings approach established thresholds.<br /><br />The presentation’s recommended best practices are to document preconstruction conditions, identify properties at risk, review construction methods, quantify potential impacts, monitor throughout construction, prepare an emergency response plan, and verify conditions after work is complete.
Keywords
construction risk management
neighboring properties
preconstruction survey
ground movement
settlement monitoring
vibration monitoring
excavation impacts
building condition assessment
urban construction
post-construction review
×
Please select your language
1
English