false
OasisLMS
Login
Catalog
Risky Business Managed: Up-down Construction in De ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation describes the geotechnical design and construction of a 62-story Boston tower with a four-level, 60-foot-deep basement, built just feet from neighboring high-rises. The site straddled Boston’s historic shoreline, with glacial soils and bedrock beneath much of the excavation.<br /><br />To protect adjacent buildings, the team used four-foot-thick slurry walls near the most sensitive neighbors and top-down construction, with permanent floor slabs bracing the walls. They also carefully sequenced wall panels, installed a reinforced pressure slab to limit groundwater-related settlement, and used extensive modeling and instrumentation to predict and monitor impacts.<br /><br />A third-party geotechnical peer review helped build confidence among the owner, neighbors, city, and project team, and contributed to design and monitoring improvements. Construction movements remained within agreed limits: nearby buildings settled roughly 0.2–0.3 inches, and groundwater levels recovered after the pressure slab was completed. The project demonstrated the value of detailed analysis, monitoring, communication, and independent review.
Keywords
geotechnical design
slurry walls
top-down construction
deep excavation
Boston tower
groundwater settlement
×
Please select your language
1
English