false
OasisLMS
Login
Catalog
San Diego Courthouse Commons Shaft Shoring and Tun ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The Courthouse Commons Tunnel project in downtown San Diego connected the County Central Jail to the State Courthouse. The work included a three-story underground transfer shaft and a 320-foot-long, 23-foot-diameter modified horseshoe tunnel, excavated about 60 feet below ground using the sequential excavation method. The tunnel passed through sandy deposits and an active fault zone, with groundwater managed through dewatering wells.<br /><br />Construction began in April 2020. The 18-by-52-foot shaft was shored with 41 deep piles—23 secant piles beside the jail and 18 soldier piles—with three levels of internal bracing. Crews excavated in four-foot lifts, installing bracing as they progressed. Restricted access required different equipment at upper and lower shaft levels, and a temporary sliding bridge maintained truck access to the jail.<br /><br />Three arrays of grout-filled canopy tubes supported tunnel excavation. The project used 7⅝-inch-diameter tubes, installed in reaches up to 99 feet long, with alignment monitored by an inertial-sensing gyro. A testing program assessed tube bending strength, and crews followed specified grout-volume and pressure criteria during installation.<br /><br />To mitigate settlement beneath the old jail, cement grout was injected under strip footings and grade beams through drilled holes or sleeve ports. The project was completed without settlement or collapse. The presentation identifies teamwork, technical expertise, workforce, equipment, and support as key factors in its success.
Keywords
Courthouse Commons Tunnel
San Diego
sequential excavation method
underground transfer shaft
secant piles
soldier piles
canopy tubes
dewatering wells
cement grouting
settlement mitigation
×
Please select your language
1
English