false
OasisLMS
Login
Catalog
San Diego Courthouse Commons Shaft Shoring and Tun ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Condon-Johnson installed temporary shaft shoring and canopy tubes for a 320-foot inmate-transfer tunnel beneath downtown San Diego, connecting the County Jail to the courthouse. The 60-foot-deep tunnel crossed streets and passed near the Old Jail, where existing footings and grade beams required additional grouting to limit settlement risk.<br /><br />The 18-by-52-foot shaft was supported by secant piles beside the jail and soldier beams and lagging on the remaining sides. Crews excavated in stages, installed three levels of internal bracing and a temporary truss, then constructed a reinforced 9,000-psi bottom slab. Limited access, live dewatering wells, and the need to maintain truck access complicated the work.<br /><br />Three reaches of canopy tubes were installed, their alignment checked with a gyro, and the tubes grouted. Monitoring and inspections found no settlements or collapses during construction. The presentation credited teamwork among the owner, contractor, and field crews as key to the project’s success.
Keywords
temporary shaft shoring
canopy tubes
inmate-transfer tunnel
secant piles
downtown San Diego
×
Please select your language
1
English