false
OasisLMS
Login
Catalog
Secant Pile Wall Design and Construction for Below ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation examines the secant pile wall supporting a two-level underground garage at Boston’s Air Rights Parcel 12, a complex development built over the Massachusetts Turnpike beside active commuter and Amtrak tracks. The excavation was about 16 feet deep and only 9–10 feet from the rails, where strict movement limits, high groundwater, and installation risks ruled out alternatives such as slurry walls and soldier-pile systems.<br /><br />The secant pile wall served as temporary earth support, a permanent foundation wall, and support for heavy building loads. It was designed and installed in small, cased sections, with early design coordination and extensive monitoring to protect rail operations.<br /><br />Automated instruments tracked wall deflection and movement at points along four rails. Although installation triggered frequent alerts—often for track heave and lateral movement—the measured movements remained small, and none exceeded the limiting criteria. Wall deflection was about half an inch, broadly consistent with predictions.<br /><br />The speaker concluded that the system suited the site well, while emphasizing that sensitive monitoring can generate false or frequent alerts. Clear communication protocols, redundant measurements, experienced oversight, and attention to trends are essential to avoid alert fatigue and respond appropriately when movement is significant.
Keywords
secant pile wall
Boston Air Rights Parcel 12
underground garage
railway excavation
groundwater
structural monitoring
track movement
×
Please select your language
1
English