Site Challenges of RM Clayton WRC
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The RM Clayton wastewater treatment plant expansion in Atlanta increased capacity from 240 to roughly 320–350 million gallons per day. The $53 million design-build project required a deep excavation beside an operating plant, with limited access, undocumented existing foundations and utilities, and highly variable rock conditions.<br /><br />A major challenge emerged when large rock wedges began sliding from the excavation face. Mapping revealed unfavorable joint sets, prompting extensive rock bolting, mesh, shotcrete, and careful blasting. The team also supported existing structures and high-voltage utilities, and underpinned settlement-sensitive equipment and a stairwell using micropiles and reinforced concrete.<br /><br />Because the project moved quickly, designs were completed in about four weeks, and geotechnical conditions were assessed using construction equipment already on site. Key lessons included verifying rock-cut stability in the field, obtaining reliable as-built information, maintaining engineering oversight during construction, and addressing worker safety early. Conservative underpinning protected critical equipment without disrupting treatment operations.
Keywords
wastewater treatment plant
deep excavation
rock bolting
micropiles
construction safety
geotechnical engineering
×
Please select your language
1
English