false
OasisLMS
Login
Catalog
Slope Stabilization with Rock Anchors and Slope Dr ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation described a second repair of a landslide behind high-value homes in the Nashville area. An earlier rock buttress had continued to move during wet weather, as groundwater weakened the fill and underlying clay-shale interface. A new team designed an anchored reaction-block system, adding horizontal and toe drainage, monitoring, and plans to restore the homeowners’ yards.<br /><br />A key lesson was to analyze construction-stage risks, not just the completed design. Modeling reduced soil strength around anchor drilling showed the factor of safety could fall from 1.7 to 1.2, helping the team plan safe drilling. The contractor also proposed constructability changes, including wider temporary access and individual concrete reaction blocks.<br /><br />Thirty-seven anchors were installed and tested; several required replacement or extension due to weaker rock. Load cells provide ongoing monitoring. The speaker emphasized teamwork, careful field logging, flexibility, and anticipating groundwater and construction conditions to avoid repeating a failed repair.
Keywords
landslide repair
anchored reaction-block system
groundwater drainage
anchor drilling risk
slope stability modeling
construction monitoring
×
Please select your language
1
English