false
OasisLMS
Login
Catalog
SuperPile(s)? Chain of Rocks Foundation Mitigation
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation describes foundation problems during construction of the Chain of Rocks Canal Bridge near St. Louis. The new bridge’s Pier 4 was designed on five drilled shafts, each extending through deep sand and gravel into limestone. During construction, an unsupported excavation collapsed after polymer-slurry levels were not maintained, causing settlement near the adjacent, traffic-carrying bridge and trapping drilling equipment.<br /><br />The team replaced the obstructed shaft with a group of four battered, 30-inch-diameter driven pipe piles. Design required iterative analysis to match the drilled shafts’ lateral response under seismic loading, avoid the abandoned tools, and ensure the piles could be installed safely. High-strain dynamic testing confirmed adequate resistance without excessive driving stresses. The mitigation avoided further settlement.<br /><br />Key lessons include the risks of uncased excavations near existing foundations, the value of considering alternative foundation systems, and the importance of optimizing permanent casing and shaft design. The speaker also notes that dynamic testing can be cost-effective and that complex foundation solutions may not suit a low-bid approach.
Keywords
foundation problems
drilled shafts
driven pipe piles
seismic loading
dynamic testing
Chain of Rocks Canal Bridge
×
Please select your language
1
English