false
OasisLMS
Login
Catalog
TDOT SR-108 Landslide Repair - Anchored Soldier Pi ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
The presentation covered TDOT’s SR-108 landslide project in Whitwell, Marion County, Tennessee. After major movement and drainage failures, TDOT engaged the team in 2020 to investigate and develop repairs. The site crosses varied Cumberland Plateau geology, including sandstone, shale, siltstone, and limestone. Difficult drilling and unexpectedly deep movement revealed a larger slide than initially assumed; the investigation ultimately included 21 borings, inclinometers, piezometers, and geophysical surveys.<br /><br />A rock buttress was considered but proved too costly. The selected concept is an approximately 1,800-foot anchored soldier-pile wall, supported by global-stability analyses using field measurements, laboratory testing, and geophysical data. The wall is intended to stabilize the roadway, not the entire hillside; some movement below it is expected to continue, likely more slowly. Drainage improvements, including horizontal drains, are also planned. Design work remains underway, with construction expected to follow and a future presentation planned.
Keywords
TDOT
SR-108 landslide
Whitwell Tennessee
anchored soldier-pile wall
drainage improvements
Cumberland Plateau geology
×
Please select your language
1
English