Tangenvika Railway Bridge - Drilled and Driven pil ...
PPT Presentation
PPT Presentation
Back to course
Pdf Summary
The presentation covers the foundation works for the Tangenvika Bridge in Norway. The overall project ran from June 2022 to May 2027, with foundation works taking place from July 2022 to September 2025.<br /><br />The foundation design used a mixed solution: steel core piles on two axes, drilled piles on seven axes, and driven piles on five axes. The slides describe pile welding, drilled piles and an RC system, as well as driven-pile installation, including pitching the longest pile and the use of special equipment.<br /><br />The presentation also addresses the project’s carbon footprint and the challenges posed by extreme weather, including flooding in 2023 and winter conditions in 2023–24.
Keywords
Tangenvika Bridge
foundation works
Norway
steel core piles
drilled piles
driven piles
pile welding
RC system
carbon footprint
extreme weather
×
Please select your language
1
English