false
OasisLMS
Login
Catalog
The Stockholm Bypass – A Grouting Design in Accord ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
Mikael Kreutz presents an adaptive pre-grouting design developed for the Stockholm Bypass, a major hard-rock project with 18 km of tunnel along a 21 km stretch. In 2017, unexpectedly weak, water-conductive rock in the northern area made it difficult to meet strict water-ingress limits, prompting a redesign.<br /><br />The approach uses an observational method rather than relying rigidly on geological forecasts. Drilling data, water inflows, grout takes, and other field observations guide decisions about grouting class, additional rounds, and when to stop. Flowcharts and defined control and termination criteria help teams make consistent, transparent decisions, while allowing the design to adapt to actual ground conditions. The fan layout supports up to three grouting rounds, with additional measures for challenging zones.<br /><br />Although the method makes scheduling and contractor compensation harder to predict, Kreutz reports that it has worked well for the client and contractor and has informed other Stockholm projects. His central message: use observed data to adapt grouting in practice.
Keywords
adaptive pre-grouting
Stockholm Bypass
observational method
rock grouting
water ingress control
×
Please select your language
1
English