Trencher Method vs. Slurry Trenching: A Pros & Con ...
Paper
Paper
Back to course
Pdf Summary
The paper compares chain-trencher (Chain-Mixing-Method, or CMM) installations with conventional slurry trenching for cutoff walls, collection trenches, and permeable reactive barriers. A trencher mixes or excavates soil in place, reducing the need for open trenches and extensive support equipment. It can work in tight spaces, below the water table, along curves and moderate grades, and may reduce costs, schedules, site disturbance, and spoil volumes. Its limitations include difficulty cutting through boulders and other large obstructions, typical depth limits of about 50 feet, inability to verify key soils directly, and challenges with utilities and separating unsuitable soils.<br /><br />Five case studies show that method selection depends on site conditions and design requirements. CMM reduced disturbance and improved schedule on a large perimeter cutoff wall, and was well suited to a narrow dike crest. It was also selected for a collection trench near the water table after boulders were removed in advance. In contrast, frequent boulders made conventional slurry trenching the safer choice for a building-site cutoff wall. At a constrained site with potentially problematic soil and groundwater chemistry, self-hardening slurry excavation was chosen to remove the in-place materials and protect barrier performance.<br /><br />The authors emphasize thorough geotechnical, obstruction, groundwater, and chemistry investigations, as well as treatability testing and early collaboration among owners, designers, and contractors. CMM’s inability to verify a key makes reliable subsurface data especially important. Spoil management, equipment access, and the risks of changing conditions should also inform planning.<br /><br />Neither method is universally superior. Trencher technology can complement or replace slurry trenching where its advantages suit the site, but conventional slurry remains versatile and established. The appropriate method is the one that can reliably meet the design intent while balancing safety, cost, schedule, and site constraints.
Keywords
chain-trencher
chain-mixing-method
slurry trenching
cutoff walls
collection trenches
permeable reactive barriers
geotechnical investigation
boulder obstruction
site constraints
groundwater chemistry
×
Please select your language
1
English