Pdf Summary
The Twin Ports Interchange project in Minnesota replaced aging, low-profile bridges—costly to inspect and maintain and poorly suited to heavy port freight—with earth embankments and upgraded interchange infrastructure. Delivered through a construction-manager/general-contractor (CMGC) approach, it became Minnesota’s largest ground-improvement project.<br /><br />The column-supported embankment system covered about 67,063 square yards (13.8 acres) and included 8,046 ground-improvement elements: 6,750 concrete columns and 1,836 steel H-piles. The work cost approximately $23.7 million, including columns, caps, a load-transfer platform, lateral reinforcement, and testing. The wider interchange includes seven bridges, ten retaining walls, new drainage, lighting, signs, and concrete pavement.<br /><br />Subsurface conditions varied substantially, with shallow and deep compressible soils, intermittent sand layers, glacial till, and bedrock. Three-dimensional numerical modeling using a Plastic Hardening soil model informed the design of the embankments, abutments, walls, columns, piles, and lateral reinforcement. Modeling indicated that #10 reinforcement bars in a lower layer approached yielding; using #14 bars addressed the concern and helped control lateral spreading.<br /><br />Construction included concrete columns and caps, H-piles, steel plates, a load-transfer platform, and lateral reinforcing bars. Instrumentation monitored pore pressure, settlement, axial strain, lateral strain, and lateral displacement to assess ground and structural performance.
Keywords
Twin Ports Interchange
Minnesota
ground improvement
construction-manager/general-contractor
CMGC
column-supported embankment
concrete columns
H-piles
3D numerical modeling
lateral reinforcement
×
Please select your language
1
English