Use of Nondestructive Testing To Establish Install ...
Video
Video
Back to course
[Please upgrade your browser to play this video content]
Video Transcription
Video Summary
At New York City’s Jamaica Bus Depot project, approximately 1,000 continuous flight auger piles were planned for a new facility. The client’s specification required 15 feet between freshly grouted piles for 24 hours, slowing installation. The design-build team used a test-pile program to assess a faster sequence: installing adjacent piles 12 feet apart within the same shift, and drilling near piles after about 12–16 hours.<br /><br />Thermal integrity profiling (TIP) and low-strain sonic echo testing were used alongside construction records. Testing found no evidence that nearby drilling disturbed pile integrity. Two anomalies were identified, but both were attributed to pile construction: reinforcement-cage misalignment in one pile and a neck in another. The test program prompted improvements to cage placement, grout retardation, and auger withdrawal procedures. Production testing of 5% of the piles found no further anomalies across more than 1,000 piles.<br /><br />The results supported a more efficient installation sequence consistent with relevant industry guidelines and demonstrated the value of combining testing methods with construction records.
Keywords
Jamaica Bus Depot
continuous flight auger piles
thermal integrity profiling
low-strain sonic echo
test-pile program
pile installation sequence
×
Please select your language
1
English