“Borehole Stabilization” for Deep Excavation, An Essentials Part in Bored Piling / Diaphragm Wall Construction
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

Any type of deep excavation whether for Bored Piling, Diaphragm Walls or Contiguous Bored Piling Walls depends on forming a stable borehole with a defined cross-section to receive safely the permanent materials. In modern construction the excavation depth can reach well the range of 100 m and above. The diameters of the Piles reach often sizes of 2.5 m and bigger. Top casings in Bored Piles (Diaphragm Wall none) are rather short and stability beyond need to be secured by stabilization slurry. The boreholes need to penetrate through a variety of different materials and stand open for an extended period. Without a safe stable borehole, it is impossible to produce quality products and work cost-efficient. The understanding and proper usage of a suitable slurry is a key element essential for the delivery of Foundation Elements with high quality and within a reasonable budget. The setting of mechanical and rheological parameters in specifications is necessary and helpful, but probably insufficient to embrace and control such a key element in the practical implementation of foundation construction. The proper selection, design, implementation and supervision of slurries on site requires both from Contractors and Engineers to understand how different slurries do function. Only with this knowledge the right decisions in slurry operations can be done. This talk is directed to give some help to both, Contractor’ s and Engineer’ s, in understanding how different type of slurries do work. (Which ones should be preferred in what kind of soils.) The better knowledge will help the Contractor to control cost and enhance production. The Engineer will be able to assist in arriving at the appropriate technical choices and include in the specifications. 

Abstract: Theme 1

Mr. Thomas Domanski
International Conference Proceedings
Powered By