A Fully Connected Jobsite is a Must for the Future
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital drawings. Here will Building Information Modeling (BIM) be one of the trends for the future. We will see more and more projects leaving the “old way” of 2D drawings and moving into 3D planning including metadata of the foundations. But even with a perfect BIM model of a jobsite, we are not at final end of digitalization. While execution of the project at the jobsite, a second data silo is evolving. Data collected directly from construction equipment and manual measurements is currently undervalued in most projects. Paper is passed to the equipment operator and major data from measurements on site are noted on paper and digitized afterwards. Automatically collected data is not be used to create site progress reports or similar report. So, the real “data” just flows around without connection to any other data already existing in projects. And then the third silo arises: The documentation of the project. Data collected on paper es reentered to create some basic documentation of the work handed over to the client. Spreadsheet software is still the “tool-to-be-used” to create at least some documentation. Finally, the documentation is not connected to the data created while planning and not connected to the automatically collected data from the jobsite. A connected jobsite in the foundation industry must link these information silos and have to create a full data-workflow from the design through the execution to the as-built documentation.

Author: Jochen Maurer, CEO and Christian Hoyme, Product Manager

Annual Conference Proceedings
Powered By