Advantages of Pressed-In Sheet Piles for New Orleans' Hurricane and Storm Damage Risk Reduction System Flood Control Project
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The New Orleans area has been repeatedly flooded by major storms and hurricanes since its French colonial era. After severe flooding in May 1995, the U.S. Congress authorized a massive flood protection project called the Southeast Louisiana Urban Flood Control Program (SELA) in 1996 to improve interior drainage in Orleans, Jefferson, and St. Tammany parishes. However, the project was not fully funded before the landing of Hurricane Katrina in 2005 and Hurricane Rita, which breached many of the area’s levees and flooded 80 percent of the city. Finally, the project was fully funded in 2008 and has been worked on towards its 2017 completion. Another large project simultaneously worked on in the area is the Hurricane and Storm Damage Risk Reduction System (HSDRRS). This system was designed for a 100-year level of flood risk reduction. One particular project within the HSDRRS rendered successful due to an unconventional method of pile driving that was utilized to install sheet piles to reinforce an existing concrete I-wall. This paper will discuss how and why this non-vibratory method of sheet pile installation allowed the project to be successfully completed ahead of schedule.

Subjects: Friction fatigue, Driveability, Open-ended pipe piles, Wave Equation Analysis, Static Resistance to Driving, SRD

Author: Ian Vaz and Takefumi Takuma

Publisher: DFI

Annual Conference Proceedings
Powered By