In 2009, storm surge from Hurricane Sandy inundated the Bay Park Sewage Treatment Plant located at El. +4 to +12 (+1.2 to +3.6 m) in East Rockaway, Long Island, NY. With all systems down, raw sewage water mixed in the floodwaters. A recurrence of such an event being unacceptable, and in view of rising future sea levels, a flood protection project was developed by Nassau County with funding coming in large part from the federally funded Sandy Rescue Fund. Designed by Arcadis/Hazen & Sawyer Engineers J.V., the protection took the form of a perimeter barrier capable of withstanding future storm surge. Due to limitations imposed by property lines and existing facilities, a levee design with three different types of cross section was developed to adapt to each location, adding construction complexity. The Long Island subsurface is characterized by beach sand extending to great depth. The clay required for the core and levee cover therefore had to be brought in from out of state. A thin silty clay layer at El. -23 to -25 (-7.0 to -7.6 m) served as an aquitard. The under-seepage was reduced by a hanging cut-off wall designed as a vibrated beam thin wall and filled with a salt water resistant, low permeability, self-hardening slurry.
Subjects: barrier, berm, T-wall, I-wall, cut-off wall, clay core, displacement pile, augered cast-in-place pile, jet grout panel, vibrated beam, self-hardening slurry, flood control
Author: Gilbert Tallard, David Guy, John Stanbury
Publisher: DFI