Aggregate Pier Group Load Test Results For Large Infrastructure Project In The Middle East
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

The Kingdom of Saudi Arabia consists of vast deserts that reach temperatures up to 50 degrees Celsius and are characterized by endless sand dunes. When the Kingdom selected the location of the new Jizan international airport, little did they know that the airside would be characterized by soft, nearly normally consolidated silt and clay extending below a thin sand crust. Searching for solutions, the design team elected to reinforce the subsurface at the airside Apron with Rammed Aggregate Pier® (RAP) ground improvement elements and desired verification that the novel method would stand the test of prolonged static aircraft loads. Because the concrete pavements would serve to spread the load, a “zone load test” was performed, consisting of applying a uniform bearing pressure of 150 kPa over a 7.5m square concrete footing. Unlike individual pier load tests, the zone test allowed the project engineers the opportunity to confirm design parameter values under large-loading area conditions, a situation not often available to most designers. This paper presents the results of the zone load test whose results may be interpreted to better understand design parameter values. This paper is of particular significance because it adds a value contribution to the relatively few numbers of “group load tests” available in the literature for ground improvement applications.
Gianni; Mr. Gianni Martinez
International Conference Proceedings
Powered By