A new waterfront park was developed on Long Island in close proximity to the East River and Newtown Creek. The existing ground consisted of fill over soft organic clay, medium dense silty sand, glacial till and schist bedrock. The ground was initially raised to preload the underlying soft soils to stabilize the ground in preparation for site development. The ground was subsequently cut down to temporary grades for installation of foundation piles for the overlook structures and construction of reinforced concrete cantilever retaining walls forming pathways located adjacent to the water bodies. The retaining walls were located in two rows at different elevations along the sides of a steep embankment. Where the pathways converge, some
of the walls were too close to each other, and were redesigned as a combined U-wall with a common base slab. The individual retaining walls were designed for adequate bearing, sliding and overturning resistance. Ground anchors were installed to enhance global stability of the retaining walls. This paper presents the design considerations for the retaining walls for various loading conditions, and evaluation of the trial and proof tests for the anchors.
Subjects: waterfront, cantilever retaining wall, global stability, ground anchor, trial test, proof test
Author: Chu E. Ho and Paul Napoli