For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sediments at the base of bulkhead walls removes support for the toe of the wall that must be assessed. Evaluation of this impact can be problematic for aging bulkheads for which no design or construction records exist. This paper will address the steps that should be taken in investigation and analysis to assure proper assessment and means to address uncertainties and gaps in information. The steps include pre-investigation data review, field inspection, geotechnical and geophysical investigation tools, parametric analysis and design tools. Examples from several bulkhead assessment projects will be provided that include a variety of conditions and tools for application. The focus of the paper will be on the integration of technologies to assess bulkhead geometry, geotechnical properties and stability, structural safety and constructability issues with removal of support, and means of temporary and permanent stabilization for environmental applications.
Subjects: None provided.
Author: Michael J. Byle, D.GE, F. ASCE, Rakam Lama Tamang, P.E. and Steve Ernst, E.I.T.
Publisher: DFI