Automation of Pile Foundation Design Post-Processing to Produce Pile Plans
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level per zone. The correlation factors are used to take into account the variability in ground across the zone and they depend upon the number CPTs within the zone. The CPTs and pile tip levels selection for zoning is an iterative process that can demand significant manual effort to produce an economical pile plan. This often leads to the use of conservative correlation factors in order to accelerate the design process. Thus, it has been automated in a tool with CPTs, pile location and loads, and calculated capacities as input. The tool has also been employed in a case study and the results are compared to the current design practise.
Rajasekar; Er. Rajasekar Subbian
International Conference Proceedings
Powered By