Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the project moving through very difficult and unpredictable g

Subjects: bored pile, drilled shaft, Kenny Hill, karst, limestone, Osterberg cell

Author: Seth K. Martin, Alan R. Poeppel, Konstantinos Syngros, Tony Nichlany

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By