On August 4th, 2014 a partial breach of the Perimeter Embankment at the Tailings Storage Impoundment located at Mt Polley Mine occurred, releasing approximately 15 billion litres of tailings, water and embankment materials downstream. A Temporary Upstream
Subjects: Cutter Soil Mixing, Seepage Control, Deep Mixing, Dam Remediation, Quality Control and Assurance
Author: Keith MacKay, David Siddle, Luke Moger, Terry Eldridge
Publisher: DFI