CONSTRUCTION OF THE TAILINGS STORAGE FACILITY FRESHET MANAGEMENT EMBANKMENT CUT OFF WALL AT MOUNT POLLEY MINE
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

On August 4th, 2014 a partial breach of the Perimeter Embankment at the Tailings Storage Impoundment located at Mt Polley Mine occurred, releasing approximately 15 billion litres of tailings, water and embankment materials downstream. A Temporary Upstream

Subjects: Cutter Soil Mixing, Seepage Control, Deep Mixing, Dam Remediation, Quality Control and Assurance

Author: Keith MacKay, David Siddle, Luke Moger, Terry Eldridge