CUT-OFFS IN TEMPORARY COFFER DAMS AS SEEPAGE BARRIERS FOR CONCRETE DAM CONSTRUCTION –A CASE STUDY OF TEESTA – V H E PROJECT IN SIKKIM (INDIA)
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneath temporary or main dam. There are number of techniques

Author: I D DAYAL, ANIL KUMAR JAIN

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By