Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1, 200-foot long bridge was completed in 1992 along Highway 99, a key corridor for the Houston area. Foundation support conditions have been altered due to natural, ongoing river morphology for three bents on the affected riverbank. Recent events include three storms within a three-year period that each exceeded the 500-year return probability. This resulted in
accelerated erosion along the northern riverbank. Over forty vertical feet of soil has been removed in some locations. Drilled shaft foundations are now functioning as columns. This review considers the behavior of columns and deep foundation elements due to the modified support conditions. The review ultimately presents a rational methodology for the review of the present and anticipated future bridge configuration with respect to current strength, service, and extreme event limits, with corresponding safety factors for the design.
Author: William Bohlen, P.E. and Brandon Smith, P.E.