Case Study for Removal of Redundant Steel Joist Piles under Base Slab of an Operational Metro Station by NATM Pilot Tunnel for Clearing the Alignment for East West Metro Line Tunnels in Kolkata, India
Create Account
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered
Description
Abstract
:
Kolkata East West Metro is a predominantly underground
corridor traversing the most congested part of the
city. The twin tunnels pass below an existing North-South Metro underground Station at a depth of 8.593 m
from base slab. It was discovered that there was a tem
porary steel decking for maintaining vehicular traffic
during construction of the underground station and parts
of some huge redundant steel joist piles were still
remaining under the base-slab of existing station which w
ould obstruct the alignment of twin tunnels of new
Metro line being bored with EPB tunnel boring machines.
Those machines were not cap
able to cut such steel
joists and it was obligatory to remove those joist piles before tunneling. As the steel joist are existing below
base slab of an operational metro station, there was no sc
ope for physical extraction of those piles from surface.
Proper methodology was devised for removal of those pile
s by construction of pilot tunnel by New Austrian
Tunneling Method [NATM] which was a unique challenge in
soft alluvial geology of Kolkata. The pilot tunnel
was subsequently suitably filled up for boring of main
tunnels. Due to sensitive location of the work, proper
measures for minimizing ground settlement was adopted to
avert any distress to the structure of the existing
metro station as well as metro tracks. Elaborate inst
rumentation schemes for monitoring ground movement
parameters were undertaken during NATM pilot tunnel
as well as subsequent work of main tunnels. The
geotechnical parameters and design issues associated w
ith this soft ground NATM pilot tunnel and subsequent
passage of main tunnels and measures adopted to restrict ground movement are discussed in this case study.
The instrumentation schemes for ground movement are also elaborated and th
e field results are compared with
predicted values.
Authors
BISWANATH; Mr. BISWANATH DEWANJEE
Course Type
International Conference Proceedings
×