Cased CFA Pile - An Alternative Piling Methods - A Chance for Technical and Economical Solutions
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of tools facing almost all types of soil and rock conditions. Kelly drilling can also deal with diameters up to 10 ft (3.00 m) and bigger or depths of more than 330 ft (100 m). Nonetheless, there is a concern about Kelly drilling as it is a relatively slow installation process. Therefore, an alternative piling method like Cased CFA (CCFA) Piles (Cased Auger Cast Piles) provides a significant advantage in terms of installation performance, schedule and cost saving potentials. Major application for the Cased CFA system is the secant pile wall construction. Against the traditional secant pile wall systems like fully cased bored piles or CFA secant piling the Cased CFA secant pile wall system has the advantage in cost and time against the fully cased system and in quality against the standard CFA system. This paper will describe the methodology and installation process in general as well as first reference projects carried out in the United States. This paper will present the results in cost and schedule saving using this method. In addition, we will also describe the limitations of this method.

Subjects: CFA, Auger Cast Pile, Cased CFA, CCFA, Secant pile wall

Author: Franz-Werner Gerressen, Gordian Ulrich and John R. Grillo, P.E., M.ASCE

Annual Conference Proceedings
Powered By