This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The initial assessment of the subsurface conditions indicated loose to medium dense soil with intermittent dense to very dense layers with no occurrence of cobbles and boulders. Sheet piles were proposed to be installed to a depth of 24 m below the ground surface to limit dewatering requirements for the cofferdam. During sheet pile installation, refusal of piles occurred at multiple locations forming passages for increased flow into the cofferdam. Modifications were made in the design of the dewatering system as a result of the increased flow. Finite element modeling was used to select the necessary modifications to the dewatering system within the cofferdam. Wells were installed based on the findings of the numerical model. Model simulations showed good comparison with monitoring of the field installed dewatering system.
Subjects: press-in, sheet pile, seawall
Author: Khuram R. Mohib, Thomas J. Sabourin and Eric S. White
Publisher: DFI