Challenges and Lessons Learned from Shoring Design of 2nd/Broadway Metro Station
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB& A was responsible for the design of the support of excavation (SOE) systems for two stations, 2nd/Broadway and 2nd/Hope, in RCC. In this paper, challenges and lesson learned from SOE design of 2nd/Broadway station with a main focus on underpinning design are discussed. 2nd/Broadway station required to cut and cover excavation of 500 ft long by almost 100 ft deep, underneath 2nd Street. SOE systems consisting of drilled soldier beams with tiebacks and/or struts. The main challenge in 2nd/Broadway station was to underpin the LA Times building which was partially protruded into the station. A chellenging underpinning system consisted of concrete panels and ground anchors was designed to support the building surcharge and prevent settlement. The underpinning system was designed based on METRO design criteria and the deflection was evaluated by Finite Element Analysis (FEA) program, PLAXIS 2D. A maximum deflection of 0.4 inches was calculated to occur at the top of the underpinning system. Data from settlement and tilt sensors showed minimal movements which aligned with PLAXIS outputs.

Subjects: support of excavation, retaining wall, underpinning, tieback, soldier pile

Author: Pirooz Barar and Babak Mamaqani

Annual Conference Proceedings
Powered By