Abstract:

The Thames Tideway Tunnel is one of the largest  current  infrastructure projects in the UK:  upgrading London’ s  Victorian sewer  network and extending  over 25km  across the city.

The Tideway construction site at  the  Earl Pumping Station  raised a number of technical, managerial, logistical and environmental  challenges.  At this 'postage stamp' sized  site, a  52m deep drop shaft  intercepting a 6.45m TBM-dug tunnel,   a combined sewage overflow chamber and other ancillary structures have been constructed within heavily contaminated ground immediately adjacent to  the live  Thames Water pumping station serving the local South London community. Solutions developed between the  joint venture of  Costain, Vinci Grands Projects & Bachy Soletanche  (CVBJV) and its partners, required extensive geotechnical works  including:  a  diaphragm wall installed using  a  hydrofraise, Cased Continuous Flight Auger (CCFA), rotary bored and Sectional Flight Auger (SFA) piling, deep soil mixing (both panels and columns),   and grouting (as jet, chemical and cementitious permeation). 

This paper discusses the  approaches  to  reviewing the challenges, risks and lessons learnt on and off site, with the aim of showcasing the cohesive implementation and integration of complex schemes within the very congested site space and  challenging  delivery programme.

Mr. Adrian Liviu Bugea; Sivilay Sayavong