Cost Effective Excavation Support in Seattle
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structures. For construction of the below grade parking for two, 40-story residential high-rise towers, shoring walls were required to support the maximum 70-foot-deep vertical excavation in downtown Seattle, Washington. The design of the excavation support system consisted of soil nails combined with closely spaced vertical elements to allow the top row of soil nails to be installed up to 10 feet below the ground surface avoiding conflicts with adjacent underground utilities. To limit deflections next to a seven-story building, the upper rows of soil nails were post tensioned. An instrumentation program was implemented to monitor the deflections in the shoring walls by means of vertical inclinometers and optical survey monitoring. The shoring wall performance, designed to limit deflection to less than 1-inch to meet the City of Seattle requirements, was validated by the instrumentation program. This paper provides a discussion of the design and construction of the shoring walls as well as the monitoring data collected from the instrumentation system.

Subjects: deep excavation, soil nailing, vertical elements, instrumentation program, monitoring data

Author: Richard D. Luark and Fernanda S. Madrona

Annual Conference Proceedings
Powered By