Cutter Soil Mixing and Augered-Cast-in-Place Piling Close to the Gulf of Mexico
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms on a daylight basement level, conference rooms on the next levels and up-scale hotel rooms on the upper levels. The new building was founded on augered-cast-in-place (ACIP) piles. The pile caps and the basement required excavations between nine and fifteen feet (three to five meters) below ground surface. BAUER Foundations Corp. (BFC) successfully used Cutter Soil Mixing (CSM) to install the support of excavation walls. This technique allowed for the adjustment of the wall alignment during execution in order to avoid existing and new piles and other underground obstructions. Nearly 1600 – 16-inch (400 mm diameter) ACIP piles were installed to an average depth of 71.5 feet (22m) below ground surface (BGS) by BFC to support the new hotel structure. Initial grout overages in piles were excessively high and ground stability issues were encountered in some pile locations. By identifying specific areas of concern BFC was able to modify the approach to ACIP installation, effectively mitigating the ongoing risks and successfully completed the project.

Subjects: cutoff, seepage, diaphragm wall

Author: Justin Simmons, Michael Arnold and Bob Faulhaber

Publisher: DFI

Annual Conference Proceedings
Powered By