DESIGN AND CONSTRUCTION OF THE CANNELTON HYDROELECTRIC PLANT COFFERDAM AND CUT-OFF WALL
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150 feet below the Ohio River levels. The new plant, which g

Subjects: excavation, river, CB Cutoff wall, seepage cutoff, cellular cofferdam, hydromill, Marine dike, stability analyses

Author: James M. Tantalla, Roderic A. Ellman, Dwight Metcalf

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By