The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150 feet below the Ohio River levels. The new plant, which g
Subjects: excavation, river, CB Cutoff wall, seepage cutoff, cellular cofferdam, hydromill, Marine dike, stability analyses
Author: James M. Tantalla, Roderic A. Ellman, Dwight Metcalf
Publisher: DFI