DESIGN OF COST-EFFECTIVE RETAINING WALL AT THE JUNCTION OF APPROACH BRIDGE OVER A RAMP
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate   fertilizer at a remote place in West Africa.   Rock phosphate ROM , transported from mines by a combination of 100 Ton and 150 Ton dumper, would   be fed to a steel bunker having capacity of 180 m3. Different options were studied for retaining wall at the junction of ramp and approach bridge. Initially options with conventional RCC Retaining Wall, Gravity Retaining Wall with Precast Concrete Blocks and Reinforced Earth walls were studied. Option with Reinforced Earth was selected as this option was much more cost effective compared to other options.  But real engineering challenges cropped up when competent execution contractors were not available nearby the site.   To minimize the cost, an innovative   option with Stepped Retaining wall was then studied. Geotechnical parameters of native soils, selected for the construction of the approach ramp were determined and it was   found that with available poor geotechnical parameters of the native soils, design of  steeped retaining wall would not be feasible   with respect to available bearing capacity, subjected dead load, live load, operational load and earth pressure. A conscious effort was then made to make the design feasible by improving the geotechnical parameters of the retained earth of ramp near the retaining wall. In view of that, mix design   with locally available materials like Silexite, Sand, Laterite, Grevel and Silt at different proportions was made and samples were tested in the laboratory to determine relevant geotechnical parameters.   Based on the test results, a suitable mix was selected that had high shear strength, enhanced bearing capacity and improved coefficient of earth pressures. Design of stepped retaining wall was then made with the selected construction materials and construction completed. The plant was successfully commissioned in December. 2021.

Keywords: Stepped Retaining Wall, Geotechnical properties, Sustainability, Stability

Abstract: Theme 4

Mr. BISWAJIT DAS; Dr. ANUP KUMAR MANDAL
International Conference Proceedings
Powered By