DRAWDOWN OF GROUND WATER CONTROL SYSTEM IN DEEP EXCAVATION SUR-ROUNDED BY CUTOFF WALLS: NUMERICAL INVESTIGATION
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Construction activities in major projects that involve deep excavations necessitate the use of vertical walls surrounding the construction site to play an important role as earth retention system. The walls are usually partially penetrating impervious wal

Subjects: Deep wells, Dewatering, Drawdown, Ground water control, Partially penetrating cutoff walls, Well penetration depth, Well location

Author: Dalia. R. Mohamed, Marawan M. Shahien, Hisham H. Hafez

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By