Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to construct five levels of below grade parking for a 35-story high-rise building, Tower 12, next to an existing 20-story tower with three levels of below grade parking, separated from the project by an 18-foot wide alley. The solution was to combine two temporary excavation support systems, soil nailing and anchored soldier piles, to work within the site constraints. Densely-arranged, short-length soil nails were used to support the upper 30 feet of the excavation, while the lower 30 feet of the excavation was supported with soldier piles combined with steeply-inclined, high-capacity ground anchors, which extended below the adjacent building foundations. The combined temporary support system eliminated the need for internal bracing, reducing construction cost and schedule. The performance of the combined soil nail and soldier pile system was monitored with an inclinometer and optical survey monitoring, which demonstrated the performance of the combined temporary support system. This paper provides a discussion of the advantages of combining different excavation systems and an analysis of movement monitoring data collected.

Subjects: deep excavation, soil-structure interaction, soil nailing, anchored soldier piles, movement monitoring

Author: Richard D. Luark and Fernanda S. Madrona

Annual Conference Proceedings
Powered By