Abstract:

As part of the Grand Paris Express project, the Pont de Sèvres station required the use of retaining structures in the form of diaphragm walls. Forty-five meters long, they are anchored in the underlying Campanian chalk. Base slab level, thirty-five meters below ground level, was reached using top-down construction. Even with this method, control over the deformations of the diaphragm wall required reinforcing the weathered chalk to improve passive soil pressure during both construction and final stages. Two processes were implemented in different sectors of the structure: localized unreinforced concrete cross walls (using diaphragm wall excavation technology); or wide-reaching soil reinforcement through Deep Soil Mixing. The article explains how to model retaining structures and these passive soil pressure reinforcement methods. Results of calculations using subgrade reaction coefficients are compared to those obtained by finite-element modelling. Issues related to the verticality tolerances of Soil Mixing columns being accounted for are also addressed: a computational approach enabling to consider possible gaps in soil treatment generated by column deviation is put forward.
Arnaud; Mr. Arnaud Roux-Drummond
International Conference Proceedings
Powered By