Deep Foundations for Top Down-Construction of High-Rise Project
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down construction in order to allow a driveway to remain open during construction of the project’s 40-foot deep excavation. The challenge was compounded by the need to utilize a mat foundation to support the high-rise construction and yet have temporary drilled shafts through the mat foundation area that would not create excessive differential settlement. This was accomplished by constructing a deck supported by eight drilled endbearing drilled shafts with Osterberg load cells and five 7-foot-diameter end-bearing drilled shafts. The Osterberg load cells served to verify the capacity of each of the drilled shafts and preload the soils at the drilled shaft tips. The 7-foot-diameter shafts were constructed with bond breakers to prevent skin friction but instead mobilize end bearing (for settlement compatibility with the surrounding mat foundation). After the drilled shafts were placed, then top-down construction began beneath the driveway, leaving the driveway supported on the drilled shafts. Construction challenges included drilling of the shafts through previously abandoned tieback anchors from an adjacent parking structure basement, as well as cemented layers within the rock materials. The paper describes the use of the various analytical methods used to calculate capacities and check settlement compatibility, the construction and testing methods utilized, and the construction challenges encountered.

Subjects: High-rise, Osterberg load cells, drilled shafts, end-bearing, construction, Los Angeles

Author: Kenneth S. Hudson, Martin B. Hudson, Ph.D. and Gwendolyn Arreguin

Annual Conference Proceedings
Powered By