The SR 83/US 331 highway is located in the Florida panhandle, where it connects the Walton County beaches to the I-10 corridor. The roadway is of vital importance to the economy of the area as well as its safety since it represents the primary hurricane evacuation route from southern Walton County. The Florida Department of Transportation (FDOT) decided to increase the number of traffic lanes from two to four and improve the geotechnical properties of the moderately deep, very loose foundation soils, that had affected the highway rideability for years. The soil mixing was selected as the method to meet the unique deep ground improvement challenges of the project. The design required that Shallow Mixing Method (SMM) be used to build a 10-foot thick platform that transferred axial load to the bottom soil layers through a series of Deep Mixing Method (DMM) columns. Upon completion over 8, 300 SMM columns and 1, 500 DMM columns had been installed, with no remedial work required. Also, only 1% of the almost 1, 500 specimens tested did not meet the specification requirements. This paper will describe the challenges encountered and provide valuable information that may be useful for other future projects, including details not previously published.

Subjects: None provided.

Author: Matteo Bertoni, Wesley Schmutzler, Alessandro Bertero and Dylan Pearson

Publisher: DFI

Annual Conference Proceedings
Powered By