Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Zee Hudson River Crossing). The $3.14 billion Design-Build
Subjects: design-build, bridge, foundation, driven pile, drilled shaft, precast pile caps, sound attenuation.
Author: Chris J. Leykam P.E., Scott. A. Jacobs P.E.
Publisher: DFI