This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and hence spliced. A number of the piles showed damage near the splices and the damage location was near the ground surface so that the damage could be verified using visual inspection. The piles and splice configuration are still in use today without modification. Further WEAP driveability analysis has been conducted which demonstrates the effect of the splice on pile stresses and a likely failure mode. A slight modification is proposed to the splice that should prevent the damage on future projects.

Subjects: Prestressed concrete piles, dynamic pile testing, damage, stresses