Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue, W 131st Street, W 130th Street and Broadway in Upper Manhattan. A support of excavation (SOE) package was first released, followed by a foundation package. The SOE package consisted of approximately 100 soldier piles and 280 anchors, up to 215’ long, to support a cut anywhere from 30’- 50’ below street level. The foundation package alone included approximately 1600 drilled micropiles. Given the breadth of the work scope, Hayward Baker Inc and Moretrench joint ventured on these two projects to bring sufficient knowledge and work resources to complete the work in an efficient and timely manner. This included working with the Owner/Engineer to propose different means and methods for construction to significantly reduce the schedule while meeting the design intent, such as large diameter (36” diameter) augercast piles
in place of conventionally drilled soldier piles and large hollow-bar micropiles (103/51 bars) in lieu of pressure-grouted micropiles. The anchors, ranging from 3 to 22 strands, were used for earth retention through both soldier pile and lagging walls and existing slurry walls. These anchors were complicated based not only on their size and length, but also the need to drill some of them under the historic Studebaker building. The overall magnitude of the project with considerations to resource management and material lead times will be addressed, highlighting critical strengths provided by the Contractor to ensure project success.
Subjects: None provided
Author: Jeffrey Di Stasi, Frank Di Salvo, P.E. and Justin Lukens