New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical support systems that enable a more constant delivery and quality of installation of pile foundations and other applications. For example: assistance systems capable of relieving the machine operator of automating monotonous or repetitive operations. Real time installation control of the production process to manage quality control, or data transfer and reporting systems capable of keeping pace with the digital future. This paper will describe these new approaches and considerations required for these new developments. The paper also describes the equipment which is needed to execute the work under the various conditions and provides references herein.
Subjects: Electronic, Assistant Systems, Continuous flight auger (CFA), Piling, Piling data, Rig instrumentation
Author: Franz-Werner Gerressen