Elimination of Environmental Footprint: LVCC Expansion - Foundation Installation
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Convention Center District Plan. Totaling around 600 shafts (60 feet depth and 3-foot diameter), the foundation installation completed via uncased drilled shaft operation, spanned from October to December of 2018. During this installation, flowback water from the water table was encountered that contained various solids ranging from cobbles to clays to silts, as well as trace amounts of contaminants of concern (COCs) left behind as a result of previous business that used to occupy the same real estate as the current expansion; more specifically, Perchloroethylene (PCE), an organic chemical widely used as a solvent and degreaser. With over 2.5 million gallons of waste slurry to be treated, technologies were deployed to reclassify the waste from liquid to solid waste as well as recover and treat the water for reuse in land spraying applications. Utilizing these technologies, it is estimated that 1.2 million gallons of water was able to be reclaimed along with over 6, 400 tons of solids; resulting in hundreds of thousands of dollars in cost and environmental savings.

Subjects: Slurry, Waste, Dewatering, Reclamation

Author: Zachary Q. Maassen

Annual Conference Proceedings
Powered By