Excavation Support for a Hospital Addition
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

Excavation support for a new large hospital addition. The overall cut was up to 50' high and contained a combination of soldier piles and lagging, and soil and rock anchors with shotcrete. some of the Excavation support was for one-sided forms while other portions were offline. The Excavation support had to make allowances for RT cranes sitting directly on top of the Excavation Support. Also during the excavation a large permanent soldier pile wall and anchored wall was deconstructed and demolished for the new hospital expansion. Additionally, micropiles were utilized for portions of the building and tower crane foundation.

Edward; Mr. Edward Laczynski
Seminar Proceedings