Abstract:
Excavation support for a new large hospital addition. The overall cut was up to 50' high and contained a combination of soldier piles and lagging, and soil and rock anchors with shotcrete. some of the Excavation support was for one-sided forms while other portions were offline. The Excavation support had to make allowances for RT cranes sitting directly on top of the Excavation Support. Also during the excavation a large permanent soldier pile wall and anchored wall was deconstructed and demolished for the new hospital expansion. Additionally, micropiles were utilized for portions of the building and tower crane foundation.