false
OasisLMS
Login
Hamburger Menu
Catalog
Foundations for the New Mississippi River Bridge, ...
Foundations for the New Mississippi River Bridge, St. Louis
Create Account
Availability
On-Demand
Cost
Member: $0.00
Non-Member: $25.00
Credit Offered
No Credit Offered
Description
This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1, 500 ft (457.2 m) main span of the cable-stayed bridge is supported by two delta tower pylons in the river, with anchor piers on each bank. The final foundation design was completed as a part of an Alternate Technical Concept (ATC) proposal by the winning construction team, and utilized drilled shafts up to 11.5-ft (3.5-m) diameter that were socketed into very hard limestone. As part of the ATC foundation design, a full-scale, bidirectional static load test was performed to verify the design and allow use of higher resistance values. This paper presents the results of the site exploration, construction of the load test shaft, details of the load testing, and a comparison of the test results with various design parameters.
Authors
Axtell, P. J. & Brown, D. A.
Course Type
Journal
×
Foundations for the New Mississippi River Bridge, St. Louis Course List
Login
×
Please select your language
1
English