Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an environmentally sensitive wetland. Project requirements manda

Subjects: Driven Piles, PDA Testing, Top-Down Construction, Difficult Soils, Till-like Materials

Author: Ali Azizian, Brian Hall

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By