GOETHALS BRIDGE REPLACEMENT PROJECT - PERFORMANCE-BASED DESIGN OF THE DRILLED SHAFT FOUNDATIONS
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge includes 1, 650 feet long signature steel composite cable-

Subjects: performance-based design, drilled shaft foundation, finite element analysis, soil-pile interaction

Author: Chunli Wei, Mark Jen, Xiaojun Wang

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By