The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin retaining wall. The powerhouse excavation extends though
Subjects: artesian, excavation, grout, gypsum, seepage, void
Author: Rachael V. Bisnett, Thomas G. Andrews, Dewey W. Geary, R. Michael Bivens
Publisher: DFI